FIRSTENERGY WILLOW ISLAND

Substation

Ohio · MONONGAHELA POWER CO

Max voltage
138
kV

FIRSTENERGY WILLOW ISLAND is an electric transmission substation in Ohio, operated by MONONGAHELA POWER CO. It is classified as sub-transmission (138 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines6

Ownership & operation

OperatorMONONGAHELA POWER CO
StateOhio
Coordinates39.3763, -81.2285

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#7545138 kVMONONGAHELA POWER COIN SERVICE2.0 mi
#31647138 kVMONONGAHELA POWER COIN SERVICE26.1 mi
#43099138 kVMONONGAHELA POWER COIN SERVICE0.3 mi
#45506138 kVMONONGAHELA POWER COIN SERVICE1.3 mi
#47140138 kVMONONGAHELA POWER CO0.0 mi
#49050138 kVMONONGAHELA POWER COIN SERVICE1.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FIRSTENERGY WILLOW ISLAND, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FIRSTENERGY WILLOW ISLAND substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
KAMMER (138KV)Substation-AdjacentOHMonroe County345 kV600 MW3.2 yrs69.9
BELMONTSubstation-AdjacentWVPleasants County765 kV1,000 MW3.2 yrs68.7
WASHINGTON ENERGY FACILITYSubstation-AdjacentOHNoble County345 kV600 MW3.2 yrs68.5
Greenfield (BELMONT - MOUNTAINTEER)GreenfieldWVWood County765 kV1,000 MW3.2 yrs67.1
UNKNOWN151772Substation-AdjacentOHMonroe County138 kV100 MW3.2 yrs67.0
Greenfield (KAMMER (138KV) - WASHINGTON EN)GreenfieldOHMonroe County345 kV600 MW3.2 yrs66.9
UNKNOWN137126Substation-AdjacentOHNoble County138 kV100 MW3.2 yrs66.7
Greenfield (BELMONT - MOUNTAINTEER)GreenfieldWVWirt County765 kV1,000 MW3.2 yrs66.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FIRSTENERGY WILLOW ISLAND substation, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.