FIRSTENERGY WILLOW ISLAND
SubstationOhio · MONONGAHELA POWER CO
FIRSTENERGY WILLOW ISLAND is an electric transmission substation in Ohio, operated by MONONGAHELA POWER CO. It is classified as sub-transmission (138 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #7545 | 138 kV | MONONGAHELA POWER CO | IN SERVICE | 2.0 mi |
| #31647 | 138 kV | MONONGAHELA POWER CO | IN SERVICE | 26.1 mi |
| #43099 | 138 kV | MONONGAHELA POWER CO | IN SERVICE | 0.3 mi |
| #45506 | 138 kV | MONONGAHELA POWER CO | IN SERVICE | 1.3 mi |
| #47140 | 138 kV | MONONGAHELA POWER CO | — | 0.0 mi |
| #49050 | 138 kV | MONONGAHELA POWER CO | IN SERVICE | 1.4 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of FIRSTENERGY WILLOW ISLAND, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| KAMMER (138KV) | Substation-Adjacent | OH | Monroe County | 345 kV | 600 MW | 3.2 yrs | 69.9 |
| BELMONT | Substation-Adjacent | WV | Pleasants County | 765 kV | 1,000 MW | 3.2 yrs | 68.7 |
| WASHINGTON ENERGY FACILITY | Substation-Adjacent | OH | Noble County | 345 kV | 600 MW | 3.2 yrs | 68.5 |
| Greenfield (BELMONT - MOUNTAINTEER) | Greenfield | WV | Wood County | 765 kV | 1,000 MW | 3.2 yrs | 67.1 |
| UNKNOWN151772 | Substation-Adjacent | OH | Monroe County | 138 kV | 100 MW | 3.2 yrs | 67.0 |
| Greenfield (KAMMER (138KV) - WASHINGTON EN) | Greenfield | OH | Monroe County | 345 kV | 600 MW | 3.2 yrs | 66.9 |
| UNKNOWN137126 | Substation-Adjacent | OH | Noble County | 138 kV | 100 MW | 3.2 yrs | 66.7 |
| Greenfield (BELMONT - MOUNTAINTEER) | Greenfield | WV | Wirt County | 765 kV | 1,000 MW | 3.2 yrs | 66.5 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for FIRSTENERGY WILLOW ISLAND substation, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.