FIRSTENERGY W H SAMMIS

Substation

Ohio · AMERICAN TRANSMISSION SYSTEMS, INC.

Max voltage
345
kV

FIRSTENERGY W H SAMMIS is an electric transmission substation in Ohio, operated by AMERICAN TRANSMISSION SYSTEMS, INC.. It is classified as high-voltage (345 kv) and connects 11 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage138 kV
Voltage classHigh-voltage (345 kV)
Connected lines11

Ownership & operation

OperatorAMERICAN TRANSMISSION SYSTEMS, INC.
Co-ownerOHIO POWER CO
StateOhio
Coordinates40.5890, -80.7773

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#17197345 kVAMERICAN TRANSMISSION SYSTEMS, INC.IN SERVICE47.1 mi
#45739345 kVAMERICAN TRANSMISSION SYSTEMS, INC.IN SERVICE47.4 mi
#48186345 kVOHIO POWER COIN SERVICE4.3 mi
#50039345 kVIN SERVICE7.4 mi
#65102345 kVOHIO POWER CO0.1 mi
#28414345 kVAMERICAN TRANSMISSION SYSTEMS, INC.IN SERVICE68.6 mi
#45105345 kVIN SERVICE14.0 mi
#22056138 kVOHIO POWER COIN SERVICE1.5 mi
#41146138 kVOHIO POWER COIN SERVICE37.3 mi
#28619138 kVOHIO POWER COIN SERVICE29.9 mi
#28910138 kVOHIO POWER COIN SERVICE29.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FIRSTENERGY W H SAMMIS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FIRSTENERGY W H SAMMIS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CRANBERRYSubstation-AdjacentWVHancock County500 kV1,000 MW3.2 yrs74.7
HOYTDALESubstation-AdjacentPABeaver County345 kV600 MW3.0 yrs74.6
WYLIE RIDGESubstation-AdjacentWVHancock County500 kV1,000 MW3.2 yrs73.1
BEAVER VALLEYSubstation-AdjacentPABeaver County345 kV600 MW3.0 yrs72.7
MANSFIELD STATIONSubstation-AdjacentOHColumbiana County345 kV600 MW3.2 yrs72.5
FIRSTENERGY TORONTOSubstation-AdjacentWVHancock County345 kV600 MW3.2 yrs71.6
Greenfield (KAMMER (765KV) - SOUTH CANTON )GreenfieldOHCarroll County765 kV1,000 MW3.2 yrs71.2
BEAVER VALLEYSubstation-AdjacentWVHancock County345 kV600 MW3.2 yrs70.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FIRSTENERGY W H SAMMIS substation, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.