FIRSTENERGY TORONTO

Substation

Ohio · OHIO POWER CO

Max voltage
345
kV

FIRSTENERGY TORONTO is an electric transmission substation in Ohio, operated by OHIO POWER CO. It is classified as high-voltage (345 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage138 kV
Voltage classHigh-voltage (345 kV)
Connected lines6

Ownership & operation

OperatorOHIO POWER CO
StateOhio
Coordinates40.5777, -80.6038

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#35228345 kVIN SERVICE3.1 mi
#48186345 kVOHIO POWER COIN SERVICE4.3 mi
#11255138 kVOHIO POWER COIN SERVICE64.5 mi
#14524138 kVOHIO POWER COIN SERVICE4.6 mi
#14646138 kVOHIO POWER COIN SERVICE38.8 mi
#27918138 kVOHIO POWER COIN SERVICE42.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FIRSTENERGY TORONTO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FIRSTENERGY TORONTO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CLINTONSubstation-AdjacentPABeaver County345 kV600 MW3.0 yrs74.8
CRANBERRYSubstation-AdjacentWVHancock County500 kV1,000 MW3.2 yrs74.7
HOYTDALESubstation-AdjacentPABeaver County345 kV600 MW3.0 yrs74.6
UNKNOWN123770Substation-AdjacentPAAllegheny County138 kV100 MW3.0 yrs73.5
WYLIE RIDGESubstation-AdjacentWVHancock County500 kV1,000 MW3.2 yrs73.1
BEAVER VALLEYSubstation-AdjacentPABeaver County345 kV600 MW3.0 yrs72.7
MANSFIELD STATIONSubstation-AdjacentOHColumbiana County345 kV600 MW3.2 yrs72.5
FIRSTENERGY TORONTOSubstation-AdjacentWVHancock County345 kV600 MW3.2 yrs71.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FIRSTENERGY TORONTO substation, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.