FIRSTENERGY EDGEWATER

Substation

Ohio

Max voltage
345
kV

FIRSTENERGY EDGEWATER is an electric transmission substation in Ohio. It is classified as high-voltage (345 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage345 kV
Voltage classHigh-voltage (345 kV)
Connected lines1

Ownership & operation

Operator not catalogued for this substation.

StateOhio
Coordinates41.4675, -82.1854

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#64468345 kVIN SERVICE5.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FIRSTENERGY EDGEWATER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FIRSTENERGY EDGEWATER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN113652Substation-AdjacentOHLorain County345 kV600 MW3.2 yrs77.3
FIRSTENERGY WEST LORAINSubstation-AdjacentOHLorain County345 kV600 MW3.2 yrs75.4
BAUMHARTSubstation-AdjacentOHLorain County345 kV600 MW3.2 yrs75.1
UNKNOWN113152Substation-AdjacentOHMedina County345 kV600 MW3.2 yrs74.4
NORTH MEDINASubstation-AdjacentOHMedina County345 kV600 MW3.2 yrs74.2
TAP137257Substation-AdjacentOHLorain County138 kV100 MW3.2 yrs72.7
UNKNOWN137245Substation-AdjacentOHLorain County138 kV100 MW3.2 yrs72.2
TAP137258Substation-AdjacentOHLorain County138 kV100 MW3.2 yrs71.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FIRSTENERGY EDGEWATER substation, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.