FIRSTENERGY BAY SHORE is an electric transmission substation in Ohio, operated by THE TOLEDO EDISON CO. It is classified as sub-transmission (138 kv) and connects 9 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines9

Ownership & operation

OperatorTHE TOLEDO EDISON CO
StateOhio
Coordinates41.6909, -83.4366

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#11295138 kVIN SERVICE4.5 mi
#11310138 kVIN SERVICE8.4 mi
#11311138 kVIN SERVICE3.5 mi
#11312138 kVIN SERVICE3.4 mi
#11313138 kVIN SERVICE2.6 mi
#11315138 kVIN SERVICE7.3 mi
#11316138 kVIN SERVICE7.3 mi
#11317138 kVTHE TOLEDO EDISON COIN SERVICE0.2 mi
#64709138 kVTHE TOLEDO EDISON CO0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FIRSTENERGY BAY SHORE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FIRSTENERGY BAY SHORE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LEMOYNESubstation-AdjacentOHWood County345 kV600 MW2.2 yrs78.8
LEMOYNESubstation-AdjacentOHWood County345 kV600 MW3.2 yrs77.0
FirstEnergy Bay ShoreBrownfieldOHLucas499 MW76.5
UNKNOWN171366Substation-AdjacentOHLucas County345 kV600 MW2.2 yrs76.4
TAP137284Substation-AdjacentMIMonroe County345 kV600 MW2.2 yrs76.4
UNKNOWN113613Substation-AdjacentOHLucas County345 kV600 MW3.2 yrs74.3
UNKNOWN113830Substation-AdjacentOHLucas County345 kV600 MW3.2 yrs74.2
UNKNOWN113613Substation-AdjacentMIMonroe County345 kV600 MW2.2 yrs74.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FIRSTENERGY BAY SHORE substation, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.