BLUEBELL

Substation

Ohio · OHIO POWER CO

Max voltage
138
kV

BLUEBELL is an electric transmission substation in Ohio, operated by OHIO POWER CO. It is classified as sub-transmission (138 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage138 kV
Min voltage138 kV
Voltage classSub-transmission (138 kV)
Connected lines6

Ownership & operation

OperatorOHIO POWER CO
StateOhio
Coordinates40.8694, -81.0755

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#4328138 kVOHIO POWER COIN SERVICE18.0 mi
#8173138 kVIN SERVICE0.9 mi
#30274138 kVIN SERVICE9.4 mi
#37179138 kVIN SERVICE15.1 mi
#40361138 kVOHIO POWER COIN SERVICE18.4 mi
#40902138 kVIN SERVICE9.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BLUEBELL, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BLUEBELL substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SOUTH CANTON 765KVSubstation-AdjacentOHStark County765 kV1,000 MW3.2 yrs79.8
HIGHLANDSubstation-AdjacentOHStark County345 kV600 MW3.2 yrs77.6
UNKNOWN162533Substation-AdjacentOHMahoning County345 kV600 MW3.2 yrs76.3
SOUTH EAST CANTONSubstation-AdjacentOHStark County345 kV600 MW3.2 yrs74.6
TAP162534Substation-AdjacentOHTrumbull County345 kV600 MW3.2 yrs74.2
UNKNOWN153863Substation-AdjacentOHStark County345 kV600 MW3.2 yrs74.2
UNKNOWN115882Substation-AdjacentOHTrumbull County138 kV100 MW3.2 yrs73.2
Greenfield (KAMMER (765KV) - SOUTH CANTON )GreenfieldOHCarroll County765 kV1,000 MW3.2 yrs72.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BLUEBELL substation, Ohio. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.