WISHEK

Substation

North Dakota

Max voltage
230
kV

WISHEK is an electric transmission substation in North Dakota. It is classified as high-voltage (230 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines4

Ownership & operation

Operator not catalogued for this substation.

Coordinates46.2917, -99.6032

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#42284230 kVIN SERVICE29.2 mi
#50305230 kVIN SERVICE77.7 mi
#39244115 kVIN SERVICE10.1 mi
#48571115 kVIN SERVICE34.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WISHEK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WISHEK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WISHEKSubstation-AdjacentNDLogan County230 kV300 MW1.4 yrs72.9
Greenfield (GROTON - LELAND OLDS)GreenfieldNDMcIntosh County345 kV600 MW1.4 yrs71.0
Greenfield (GROTON - LELAND OLDS)GreenfieldNDKidder County345 kV600 MW1.4 yrs70.6
Greenfield (GROTON - LELAND OLDS)GreenfieldNDLogan County345 kV600 MW1.4 yrs70.0
Greenfield (GROTON - LELAND OLDS)GreenfieldNDLogan County345 kV600 MW1.4 yrs70.0
Greenfield (GROTON - LELAND OLDS)GreenfieldNDLogan County345 kV600 MW1.4 yrs69.7
Greenfield (GROTON - LELAND OLDS)GreenfieldNDLogan County345 kV600 MW1.4 yrs69.7
UNKNOWN158431Substation-AdjacentNDLogan County115 kV100 MW1.4 yrs69.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WISHEK substation, North Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.