WINGER

Substation

North Dakota · WAPA-- WESTERN AREA POWER ADMINISTRATION

Max voltage
230
kV

WINGER is an electric transmission substation in North Dakota, operated by WAPA-- WESTERN AREA POWER ADMINISTRATION. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorWAPA-- WESTERN AREA POWER ADMINISTRATION
Coordinates47.5578, -96.0141

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16843230 kVWAPA-- WESTERN AREA POWER ADMINISTRATIONIN SERVICE61.2 mi
#30467230 kVWAPA-- WESTERN AREA POWER ADMINISTRATIONIN SERVICE58.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WINGER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WINGER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WINGERSubstation-AdjacentMNMahnomen County230 kV300 MW1.4 yrs72.9
BAGLEYSubstation-AdjacentMNClearwater County115 kV100 MW1.4 yrs68.0
UNKNOWN130138Substation-AdjacentMNPolk County115 kV100 MW1.4 yrs67.2
Greenfield (MAPLE RIVER - WINGER)GreenfieldMNNorman County230 kV300 MW1.4 yrs66.3
Greenfield (MAPLE RIVER - WINGER)GreenfieldMNNorman County230 kV300 MW1.4 yrs66.2
Greenfield (MAPLE RIVER - WINGER)GreenfieldMNMahnomen County230 kV300 MW1.4 yrs65.1
WINGERSubstation-AdjacentMNMahnomen County230 kV300 MW1.4 yrs64.7
UNKNOWN130667Substation-AdjacentMNMahnomen County115 kV100 MW1.4 yrs64.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.