TAP175850

Substation

North Dakota

Max voltage
230
kV

TAP175850 is an electric transmission substation in North Dakota. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates46.0440, -98.7356

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#65906230 kVIN SERVICE29.5 mi
#65907230 kVIN SERVICE0.2 mi
#65908230 kV0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP175850, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP175850 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN175849Substation-AdjacentNDDickey County345 kV600 MW1.4 yrs78.7
TAP175850Substation-AdjacentNDDickey County230 kV300 MW1.4 yrs76.3
UNKNOWN132927Substation-AdjacentNDDickey County230 kV300 MW1.4 yrs75.4
GROTONSubstation-AdjacentNDDickey County345 kV600 MW1.4 yrs75.4
UNKNOWN131108Substation-AdjacentNDMcIntosh County230 kV300 MW1.4 yrs75.4
UNKNOWN133741Substation-AdjacentSDMcPherson County230 kV300 MW1.4 yrs74.8
EDGELEYSubstation-AdjacentNDDickey County115 kV100 MW1.4 yrs72.7
Greenfield (UNKNOWN132927 - TAP175850)GreenfieldNDDickey County230 kV300 MW1.4 yrs72.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen