TAP160781

Substation

North Dakota

Max voltage
115
kV

TAP160781 is an electric transmission substation in North Dakota. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates46.7168, -97.5696

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16838115 kVIN SERVICE12.7 mi
#17438115 kVIN SERVICE15.8 mi
#17439115 kVIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP160781, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP160781 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BUFFALOSubstation-AdjacentNDBarnes County345 kV600 MW1.4 yrs75.8
UNKNOWN135018Substation-AdjacentNDRansom County115 kV100 MW1.4 yrs71.5
TAP160781Substation-AdjacentNDRansom County115 kV100 MW1.4 yrs71.1
Greenfield (COAL CREEK - DICKINSON)GreenfieldNDRansom County400 kV600 MW1.4 yrs70.8
UNKNOWN135019Substation-AdjacentNDRansom County115 kV100 MW1.4 yrs70.5
Greenfield (UNKNOWN133421 - BUFFALO)GreenfieldNDBarnes County345 kV600 MW1.4 yrs70.5
Greenfield (COAL CREEK - DICKINSON)GreenfieldNDRansom County400 kV600 MW1.4 yrs70.4
Greenfield (BUFFALO - BISON)GreenfieldNDCass County345 kV600 MW1.4 yrs70.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.