TAP160724

Substation

North Dakota

Max voltage
115
kV

TAP160724 is an electric transmission substation in North Dakota. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates47.3724, -103.1628

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#1265115 kVIN SERVICE0.2 mi
#1799115 kVIN SERVICE6.1 mi
#16781115 kVIN SERVICE7.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP160724, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP160724 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
REDSubstation-AdjacentNDDunn County345 kV600 MW1.4 yrs77.6
BLUESubstation-AdjacentNDMcKenzie County345 kV600 MW1.4 yrs73.4
CHARLIE CREEKSubstation-AdjacentNDDunn County345 kV600 MW1.4 yrs72.1
UNKNOWN134499Substation-AdjacentNDBillings County115 kV100 MW1.4 yrs70.6
Greenfield (CHARLIE CREEK - ANTELOPE VALLE)GreenfieldNDDunn County345 kV600 MW1.4 yrs70.3
Greenfield (CHARLIE CREEK - BELFIELD)GreenfieldNDBillings County345 kV600 MW1.4 yrs69.8
UNKNOWN160711Substation-AdjacentNDMcKenzie County115 kV100 MW1.4 yrs69.6
Greenfield (CHARLIE CREEK - BELFIELD)GreenfieldNDBillings County345 kV600 MW1.4 yrs69.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP160724 substation, North Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.