TAP160715 is an electric transmission substation in North Dakota. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates47.8481, -103.1786

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#47752115 kVIN SERVICE0.5 mi
#47759115 kVIN SERVICE5.0 mi
#49955115 kVIN SERVICE0.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP160715, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP160715 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
JUDSONSubstation-AdjacentNDWilliams County345 kV600 MW1.4 yrs73.6
BLUESubstation-AdjacentNDMcKenzie County345 kV600 MW1.4 yrs73.4
WATFORD CITYSubstation-AdjacentNDMcKenzie County230 kV300 MW1.4 yrs73.0
WHITESubstation-AdjacentNDMcKenzie County345 kV600 MW1.4 yrs73.0
TAP160716Substation-AdjacentNDMcKenzie County115 kV100 MW1.4 yrs70.7
UNKNOWN160711Substation-AdjacentNDMcKenzie County115 kV100 MW1.4 yrs69.6
UNKNOWN134476Substation-AdjacentNDWilliams County115 kV100 MW1.4 yrs69.4
UNKNOWN134046Substation-AdjacentNDWilliams County115 kV100 MW1.4 yrs69.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.