TAP160712

Substation

North Dakota

Max voltage
115
kV

TAP160712 is an electric transmission substation in North Dakota. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates47.7832, -103.5912

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#47640115 kVIN SERVICE5.5 mi
#47654115 kVIN SERVICE3.4 mi
#47732115 kVIN SERVICE1.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP160712, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP160712 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN204457Substation-AdjacentNDWilliams County230 kV300 MW1.1 yrs75.1
BLUESubstation-AdjacentNDMcKenzie County345 kV600 MW1.4 yrs73.4
WATFORD CITYSubstation-AdjacentNDMcKenzie County230 kV300 MW1.4 yrs73.0
UNKNOWN134181Substation-AdjacentNDMcKenzie County115 kV100 MW1.4 yrs70.7
UNKNOWN131017Substation-AdjacentNDWilliams County115 kV100 MW1.4 yrs70.7
Greenfield (BLUE - JUDSON)GreenfieldNDMcKenzie County345 kV600 MW1.4 yrs70.2
UNKNOWN131047Substation-AdjacentNDMcKenzie County115 kV100 MW1.4 yrs70.0
UNKNOWN157704Substation-AdjacentNDMcKenzie County115 kV100 MW1.4 yrs70.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen