TAP135107 is an electric transmission substation in North Dakota. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates46.8605, -100.3022

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#5903115 kVIN SERVICE7.9 mi
#16923115 kV11.1 mi
#16924115 kVIN SERVICE6.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP135107, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP135107 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN135102Substation-AdjacentNDBurleigh County115 kV100 MW1.4 yrs73.7
TAP134965Substation-AdjacentNDBurleigh County115 kV100 MW1.4 yrs73.1
Greenfield (COAL CREEK - DICKINSON)GreenfieldNDKidder County400 kV600 MW1.4 yrs72.2
TAP134959Substation-AdjacentNDBurleigh County115 kV100 MW1.4 yrs72.2
TAP135105Substation-AdjacentNDBurleigh County115 kV100 MW1.4 yrs72.0
TAP135106Substation-AdjacentNDBurleigh County115 kV100 MW1.4 yrs72.0
UNKNOWN135104Substation-AdjacentNDBurleigh County115 kV100 MW1.4 yrs71.9
EAST BISMARCKSubstation-AdjacentNDBurleigh County115 kV100 MW1.4 yrs71.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP135107 substation, North Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.