TAP135079

Substation

North Dakota

Max voltage
115
kV

TAP135079 is an electric transmission substation in North Dakota. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

Operator not catalogued for this substation.

Coordinates45.8038, -100.8293

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#47885115 kVIN SERVICE27.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP135079, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP135079 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Greenfield (FORT THOMPSON - LELAND OLDS)GreenfieldNDEmmons County345 kV600 MW1.4 yrs69.5
Greenfield (ANTELOPE VALLEY STATION - BROA)GreenfieldNDEmmons County345 kV600 MW1.4 yrs67.1
UNKNOWN132843Substation-AdjacentSDCampbell County115 kV100 MW1.0 yrs66.0
TAP135079Substation-AdjacentSDCorson County115 kV100 MW1.4 yrs65.8
TAP135079Substation-AdjacentSDCorson County115 kV100 MW1.0 yrs64.4
OZ SiouxGreenfieldNDSioux1.4 yrs63.1
Greenfield (UNKNOWN131320 - TAP135079)GreenfieldSDCorson County115 kV100 MW1.4 yrs60.9
Greenfield (UNKNOWN131320 - TAP135079)GreenfieldSDCorson County115 kV100 MW1.4 yrs59.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.