TAP134929

Substation

North Dakota

Max voltage
115
kV

TAP134929 is an electric transmission substation in North Dakota. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates46.8007, -100.6994

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#830115 kVIN SERVICE0.5 mi
#13677115 kVIN SERVICE4.0 mi
#39284115 kVIN SERVICE2.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP134929, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP134929 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN132925Substation-AdjacentNDBurleigh County230 kV300 MW1.4 yrs79.1
BISMARCKSubstation-AdjacentNDBurleigh County230 kV300 MW1.4 yrs77.8
HESKETTSubstation-AdjacentNDBurleigh County230 kV300 MW1.4 yrs77.1
HESKETT 230 KVSubstation-AdjacentNDBurleigh County230 kV300 MW1.4 yrs77.1
MANDAN JUNCTIONSubstation-AdjacentNDMorton County230 kV300 MW1.4 yrs75.6
UNKNOWN132923Substation-AdjacentNDBurleigh County230 kV300 MW1.4 yrs75.2
UNKNOWN132924Substation-AdjacentNDBurleigh County230 kV300 MW1.4 yrs75.2
UNKNOWN134944Substation-AdjacentNDBurleigh County115 kV100 MW1.4 yrs75.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP134929 substation, North Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.