TAP134573 is an electric transmission substation in North Dakota, operated by OTTER TAIL POWER CO. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorOTTER TAIL POWER CO
Coordinates47.2927, -98.1078

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#18344230 kVIN SERVICE49.0 mi
#45706230 kVOTTER TAIL POWER COIN SERVICE61.6 mi
#46925230 kVOTTER TAIL POWER COIN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP134573, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP134573 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN133389Substation-AdjacentNDBarnes County230 kV300 MW1.4 yrs74.6
UNKNOWN133416Substation-AdjacentNDBarnes County250 kV300 MW1.4 yrs73.9
TAP134573Substation-AdjacentNDGriggs County230 kV300 MW1.4 yrs73.2
JAMESTOWNSubstation-AdjacentNDBarnes County230 kV300 MW1.4 yrs72.1
FINLEYSubstation-AdjacentNDSteele County230 kV300 MW1.4 yrs72.0
Greenfield (GRAND FORKS - CENTER 345KV SWI)GreenfieldNDGriggs County345 kV600 MW1.4 yrs71.3
UNKNOWN135159Substation-AdjacentNDBarnes County115 kV100 MW1.4 yrs71.0
LUVERNE WIND FARMSubstation-AdjacentNDSteele County230 kV300 MW1.4 yrs70.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP134573 substation, North Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.