TAP134421

Substation

North Dakota

Max voltage
115
kV

TAP134421 is an electric transmission substation in North Dakota. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates48.6944, -102.0624

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#27303115 kVIN SERVICE4.4 mi
#30504115 kVIN SERVICE0.6 mi
#50405115 kVIN SERVICE1.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP134421, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP134421 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN131414Substation-AdjacentNDMountrail County230 kV300 MW1.4 yrs74.1
UNKNOWN134408Substation-AdjacentNDBurke County115 kV100 MW1.4 yrs71.2
UNKNOWN134437Substation-AdjacentNDRenville County115 kV100 MW1.4 yrs71.0
UNKNOWN134432Substation-AdjacentNDMountrail County115 kV100 MW1.4 yrs70.2
UNKNOWN134433Substation-AdjacentNDMountrail County115 kV100 MW1.4 yrs70.1
UNKNOWN134417Substation-AdjacentNDMountrail County115 kV100 MW1.4 yrs70.0
UNKNOWN134415Substation-AdjacentNDMountrail County115 kV100 MW1.4 yrs69.7
UNKNOWN134411Substation-AdjacentNDRenville County115 kV100 MW1.4 yrs69.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP134421 substation, North Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.