TAP133947

Substation

North Dakota

Max voltage
115
kV

TAP133947 is an electric transmission substation in North Dakota. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates48.2400, -101.1948

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16557115 kVIN SERVICE1.6 mi
#31178115 kVIN SERVICE3.0 mi
#61606115 kVIN SERVICE1.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP133947, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP133947 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MCHENRYSubstation-AdjacentNDMcLean County230 kV300 MW1.4 yrs72.5
LOGANSubstation-AdjacentNDMcLean County230 kV300 MW1.4 yrs72.4
UNKNOWN134403Substation-AdjacentNDMcHenry County115 kV100 MW1.4 yrs72.2
TAP134360Substation-AdjacentNDWard County115 kV100 MW1.4 yrs70.9
UNKNOWN133938Substation-AdjacentNDWard County115 kV100 MW1.4 yrs70.7
UNKNOWN133936Substation-AdjacentNDWard County115 kV100 MW1.4 yrs70.7
TAP133952Substation-AdjacentNDWard County115 kV100 MW1.4 yrs70.6
TAP133946Substation-AdjacentNDWard County115 kV100 MW1.4 yrs70.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP133947 substation, North Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.