RUGBY

Substation

North Dakota · OTTER TAIL POWER CO

Max voltage
115
kV

RUGBY is an electric transmission substation in North Dakota, operated by OTTER TAIL POWER CO. It is classified as sub-transmission (115 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines5

Ownership & operation

OperatorOTTER TAIL POWER CO
Coordinates48.3249, -100.2100

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16561115 kVIN SERVICE23.6 mi
#16562115 kVIN SERVICE56.4 mi
#16564115 kVIN SERVICE5.9 mi
#17181115 kVOTTER TAIL POWER COIN SERVICE1.8 mi
#66016115 kVIN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of RUGBY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near RUGBY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN132775Substation-AdjacentNDPierce County230 kV300 MW1.4 yrs72.5
UNKNOWN132777Substation-AdjacentNDPierce County230 kV300 MW1.4 yrs72.3
UNKNOWN134343Substation-AdjacentNDMcHenry County115 kV100 MW1.4 yrs70.9
UNKNOWN134378Substation-AdjacentNDMcHenry County115 kV100 MW1.4 yrs70.7
UNKNOWN134289Substation-AdjacentNDPierce County115 kV100 MW1.4 yrs70.6
UNKNOWN134348Substation-AdjacentNDMcHenry County115 kV100 MW1.4 yrs70.4
TAP166963Substation-AdjacentNDPierce County115 kV100 MW1.4 yrs69.9
UNKNOWN134375Substation-AdjacentNDPierce County115 kV100 MW1.4 yrs69.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for RUGBY substation, North Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.