ROLETTE

Substation

North Dakota · OTTER TAIL POWER CO

Max voltage
115
kV

ROLETTE is an electric transmission substation in North Dakota, operated by OTTER TAIL POWER CO. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

OperatorOTTER TAIL POWER CO
Coordinates48.6745, -99.9275

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#3577115 kVOTTER TAIL POWER COIN SERVICE25.6 mi
#16895115 kVIN SERVICE9.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ROLETTE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ROLETTE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN134123Substation-AdjacentNDRolette County230 kV300 MW1.4 yrs73.1
UNKNOWN132775Substation-AdjacentNDPierce County230 kV300 MW1.4 yrs72.5
UNKNOWN132777Substation-AdjacentNDPierce County230 kV300 MW1.4 yrs72.3
ROLETTESubstation-AdjacentNDRolette County115 kV100 MW1.4 yrs69.5
UNKNOWN134375Substation-AdjacentNDPierce County115 kV100 MW1.4 yrs69.5
TAP160688Substation-AdjacentNDRolette County115 kV100 MW1.4 yrs69.3
TAP166964Substation-AdjacentNDPierce County115 kV100 MW1.4 yrs69.1
UNKNOWN160679Substation-AdjacentNDPierce County115 kV100 MW1.4 yrs68.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ROLETTE substation, North Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.