RISER155889

Substation

North Dakota

Max voltage
115
kV

RISER155889 is an electric transmission substation in North Dakota. It is classified as sub-transmission (115 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines2

Ownership & operation

Operator not catalogued for this substation.

Coordinates46.8070, -100.8227

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#9530115 kVIN SERVICE0.7 mi
#9533115 kVIN SERVICE0.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of RISER155889, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near RISER155889 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN132925Substation-AdjacentNDBurleigh County230 kV300 MW1.4 yrs79.1
BISMARCKSubstation-AdjacentNDBurleigh County230 kV300 MW1.4 yrs77.8
HESKETT 230 KVSubstation-AdjacentNDBurleigh County230 kV300 MW1.4 yrs77.1
HESKETTSubstation-AdjacentNDBurleigh County230 kV300 MW1.4 yrs77.1
UNKNOWN134976Substation-AdjacentNDOliver County230 kV300 MW1.4 yrs75.8
MANDAN JUNCTIONSubstation-AdjacentNDMorton County230 kV300 MW1.4 yrs75.6
ARROWHEADSubstation-AdjacentNDOliver County250 kV300 MW1.4 yrs75.3
UNKNOWN132923Substation-AdjacentNDBurleigh County230 kV300 MW1.4 yrs75.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for RISER155889 substation, North Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.