MOORHEAD

Substation

North Dakota

Max voltage
230
kV

MOORHEAD is an electric transmission substation in North Dakota. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates46.4197, -96.5563

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#20018230 kVIN SERVICE10.6 mi
#20652230 kVIN SERVICE94.2 mi
#11578115 kVIN SERVICE8.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MOORHEAD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MOORHEAD substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN130155Substation-AdjacentMNWilkin County230 kV300 MW1.4 yrs76.3
HANKINSONSubstation-AdjacentNDRichland County230 kV300 MW1.4 yrs75.3
FRONTIERSubstation-AdjacentMNWilkin County230 kV300 MW1.4 yrs74.8
MOORHEADSubstation-AdjacentMNWilkin County230 kV300 MW1.4 yrs74.4
WAHPETONSubstation-AdjacentMNWilkin County230 kV300 MW1.4 yrs73.6
MORRISSubstation-AdjacentMNClay County230 kV300 MW1.4 yrs73.5
TAP160903Substation-AdjacentMNTraverse County115 kV100 MW1.4 yrs72.8
UNKNOWN160786Substation-AdjacentMNClay County115 kV100 MW1.4 yrs72.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MOORHEAD substation, North Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.