MAPLE RIVER

Substation

North Dakota · WAPA-- WESTERN AREA POWER ADMINISTRATION

Max voltage
345
kV

MAPLE RIVER is an electric transmission substation in North Dakota, operated by WAPA-- WESTERN AREA POWER ADMINISTRATION. It is classified as high-voltage (345 kv) and connects 7 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage115 kV
Voltage classHigh-voltage (345 kV)
Connected lines7

Ownership & operation

OperatorWAPA-- WESTERN AREA POWER ADMINISTRATION
Coordinates46.9267, -97.0122

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16848345 kVIN SERVICE12.2 mi
#16846230 kVIN SERVICE60.9 mi
#16847230 kVIN SERVICE11.1 mi
#16843230 kVWAPA-- WESTERN AREA POWER ADMINISTRATIONIN SERVICE61.2 mi
#16860230 kVIN SERVICE6.6 mi
#16857115 kVIN SERVICE5.7 mi
#59411115 kVIN SERVICE7.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MAPLE RIVER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MAPLE RIVER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
AUDOBON 230KVSubstation-AdjacentMNClay County230 kV300 MW1.4 yrs79.3
ALEXANDRIASubstation-AdjacentNDCass County345 kV600 MW1.4 yrs78.3
MAPLE RIVERSubstation-AdjacentNDCass County345 kV600 MW1.4 yrs77.0
SHEYENNESubstation-AdjacentMNClay County230 kV300 MW1.4 yrs76.6
RED RIVERSubstation-AdjacentMNClay County115 kV100 MW1.4 yrs75.9
CENTENNIAL GENERATING STATIONSubstation-AdjacentMNClay County115 kV100 MW1.4 yrs75.8
FARGOSubstation-AdjacentNDCass County230 kV300 MW1.4 yrs75.5
FRONTIERSubstation-AdjacentMNWilkin County230 kV300 MW1.4 yrs74.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MAPLE RIVER substation, North Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.