HARVEY

Substation

North Dakota · OTTER TAIL POWER CO

Max voltage
230
kV

HARVEY is an electric transmission substation in North Dakota, operated by OTTER TAIL POWER CO. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorOTTER TAIL POWER CO
Coordinates47.6539, -100.3711

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#17194230 kVIN SERVICE72.0 mi
#46234230 kVOTTER TAIL POWER COIN SERVICE22.5 mi
#66017115 kVIN SERVICE4.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of HARVEY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near HARVEY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CENTER 345KV SWITCHYARDSubstation-AdjacentNDKidder County345 kV600 MW1.4 yrs73.9
TAP160697Substation-AdjacentNDSheridan County230 kV300 MW1.4 yrs73.3
Greenfield (GRAND FORKS - CENTER 345KV SWI)GreenfieldNDSheridan County345 kV600 MW1.4 yrs71.3
HARVEYSubstation-AdjacentNDSheridan County230 kV300 MW1.4 yrs70.8
Greenfield (GRAND FORKS - CENTER 345KV SWI)GreenfieldNDSheridan County345 kV600 MW1.4 yrs70.7
Greenfield (GRAND FORKS - CENTER 345KV SWI)GreenfieldNDSheridan County345 kV600 MW1.4 yrs70.5
Greenfield (GRAND FORKS - CENTER 345KV SWI)GreenfieldNDSheridan County345 kV600 MW1.4 yrs70.5
Greenfield (COAL CREEK - DICKINSON)GreenfieldNDBurleigh County400 kV600 MW1.4 yrs70.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for HARVEY substation, North Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.