ELLENDALE 345 KV

Substation

North Dakota · OTTER TAIL COMPANY

Max voltage
345
kV

ELLENDALE 345 KV is an electric transmission substation in North Dakota, operated by OTTER TAIL COMPANY. It is classified as high-voltage (345 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage230 kV
Voltage classHigh-voltage (345 kV)
Connected lines3

Ownership & operation

OperatorOTTER TAIL COMPANY
Coordinates45.7413, -98.0562

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#65903345 kVOTTER TAIL COMPANYIN SERVICE131.5 mi
#65908230 kV0.1 mi
#65909230 kV0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ELLENDALE 345 KV, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ELLENDALE 345 KV substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
GROTONSubstation-AdjacentNDDickey County345 kV600 MW1.4 yrs75.4
ELLENDALE 345 KVSubstation-AdjacentSDBrown County345 kV600 MW1.4 yrs75.0
OAKESSubstation-AdjacentNDSargent County230 kV300 MW1.4 yrs71.6
Greenfield (UNKNOWN175849 - ELLENDALE 345 )GreenfieldSDBrown County345 kV600 MW1.4 yrs70.0
Greenfield (ELLENDALE - OAKES)GreenfieldNDDickey County230 kV300 MW1.4 yrs69.8
FORMAN 230 KVSubstation-AdjacentNDSargent County230 kV300 MW1.4 yrs69.3
Greenfield (UNKNOWN175849 - ELLENDALE 345 )GreenfieldSDBrown County345 kV600 MW1.4 yrs69.3
Greenfield (GROTON - LELAND OLDS)GreenfieldSDBrown County345 kV600 MW1.4 yrs69.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ELLENDALE 345 KV substation, North Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.