BUFFALO

Substation

North Dakota

Max voltage
345
kV

BUFFALO is an electric transmission substation in North Dakota. It is classified as high-voltage (345 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage115 kV
Voltage classHigh-voltage (345 kV)
Connected lines4

Ownership & operation

Operator not catalogued for this substation.

Coordinates46.9745, -97.6973

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16841345 kVIN SERVICE21.6 mi
#38597345 kVIN SERVICE55.9 mi
#16842115 kVIN SERVICE16.1 mi
#17438115 kVIN SERVICE15.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BUFFALO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BUFFALO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BUFFALOSubstation-AdjacentNDBarnes County345 kV600 MW1.4 yrs75.8
UNKNOWN133389Substation-AdjacentNDBarnes County230 kV300 MW1.4 yrs74.6
TAP160781Substation-AdjacentNDRansom County115 kV100 MW1.4 yrs71.1
UNKNOWN135159Substation-AdjacentNDBarnes County115 kV100 MW1.4 yrs71.0
UNKNOWN133388Substation-AdjacentNDCass County230 kV300 MW1.4 yrs70.8
LUVERNE WIND FARMSubstation-AdjacentNDSteele County230 kV300 MW1.4 yrs70.8
UNKNOWN135019Substation-AdjacentNDRansom County115 kV100 MW1.4 yrs70.5
Greenfield (UNKNOWN133421 - BUFFALO)GreenfieldNDBarnes County345 kV600 MW1.4 yrs70.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BUFFALO substation, North Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.