BOWMAN

Substation

North Dakota · WAPA-- WESTERN AREA POWER ADMINISTRATION

Max voltage
230
kV

BOWMAN is an electric transmission substation in North Dakota, operated by WAPA-- WESTERN AREA POWER ADMINISTRATION. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorWAPA-- WESTERN AREA POWER ADMINISTRATION
Coordinates46.1197, -103.3299

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#69279230 kVWAPA-- WESTERN AREA POWER ADMINISTRATION36.5 mi
#69280230 kVWAPA-- WESTERN AREA POWER ADMINISTRATION17.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BOWMAN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BOWMAN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
RHAMESubstation-AdjacentNDBowman County230 kV300 MW1.1 yrs77.0
RHAMESubstation-AdjacentNDBowman County230 kV300 MW1.4 yrs73.0
BOWMANSubstation-AdjacentNDBowman County230 kV300 MW1.4 yrs72.3
UNKNOWN173526Substation-AdjacentNDSlope County230 kV300 MW1.4 yrs71.4
TAP160810Substation-AdjacentNDBowman County115 kV100 MW1.4 yrs69.4
Greenfield (UNKNOWN173526 - RHAME)GreenfieldNDBowman County230 kV300 MW1.4 yrs69.4
UNKNOWN134858Substation-AdjacentNDBowman County115 kV100 MW1.4 yrs69.3
Greenfield (UNKNOWN173526 - RHAME)GreenfieldNDBowman County230 kV300 MW1.4 yrs68.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BOWMAN substation, North Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.