BISON is an electric transmission substation in North Dakota, operated by WAPA-- WESTERN AREA POWER ADMINISTRATION. It is classified as high-voltage (345 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage345 kV
Min voltage230 kV
Voltage classHigh-voltage (345 kV)
Connected lines4

Ownership & operation

OperatorWAPA-- WESTERN AREA POWER ADMINISTRATION
Coordinates46.3219, -98.1650

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#14448345 kVIN SERVICE135.5 mi
#16841345 kVIN SERVICE21.6 mi
#16848345 kVIN SERVICE12.2 mi
#69278230 kVWAPA-- WESTERN AREA POWER ADMINISTRATION37.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of BISON, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near BISON substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BISONSubstation-AdjacentNDLaMoure County345 kV600 MW1.4 yrs75.8
Greenfield (ELLENDALE - OAKES)GreenfieldNDDickey County230 kV300 MW1.4 yrs72.2
OAKESSubstation-AdjacentNDSargent County230 kV300 MW1.4 yrs71.6
Greenfield (UNKNOWN175849 - ELLENDALE 345 )GreenfieldNDDickey County345 kV600 MW1.4 yrs71.0
Greenfield (COAL CREEK - DICKINSON)GreenfieldNDRansom County400 kV600 MW1.4 yrs70.4
Greenfield (COAL CREEK - DICKINSON)GreenfieldNDLaMoure County400 kV600 MW1.4 yrs70.3
Greenfield (COAL CREEK - DICKINSON)GreenfieldNDLaMoure County400 kV600 MW1.4 yrs70.1
Greenfield (ELLENDALE - OAKES)GreenfieldNDDickey County230 kV300 MW1.4 yrs69.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for BISON substation, North Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.