ARROWHEAD

Substation

North Dakota · ALLETE, INC.

Max voltage
250
kV

ARROWHEAD is an electric transmission substation in North Dakota, operated by ALLETE, INC.. It is classified as high-voltage (230 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage250 kV
Min voltage250 kV
Voltage classHigh-voltage (230 kV)
Connected lines1

Ownership & operation

OperatorALLETE, INC.
Coordinates47.0718, -101.1960

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#24286250 kVALLETE, INC.IN SERVICE464.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ARROWHEAD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ARROWHEAD substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN132925Substation-AdjacentNDBurleigh County230 kV300 MW1.4 yrs79.1
COAL CREEKSubstation-AdjacentNDOliver County400 kV600 MW1.4 yrs77.6
HESKETT 230 KVSubstation-AdjacentNDBurleigh County230 kV300 MW1.4 yrs77.1
HESKETTSubstation-AdjacentNDBurleigh County230 kV300 MW1.4 yrs77.1
ANTELOPE VALLEY STATIONSubstation-AdjacentNDOliver County345 kV600 MW1.4 yrs77.0
LELAND OLDSSubstation-AdjacentNDOliver County345 kV600 MW1.4 yrs76.5
UNKNOWN134976Substation-AdjacentNDOliver County230 kV300 MW1.4 yrs75.8
MANDAN JUNCTIONSubstation-AdjacentNDMorton County230 kV300 MW1.4 yrs75.6

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ARROWHEAD substation, North Dakota. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.