WOODLEAF SWITCHING STATION

Substation

North Carolina

Max voltage
500
kV

WOODLEAF SWITCHING STATION is an electric transmission substation in North Carolina. It is classified as extra-high-voltage (500 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage230 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates35.6978, -80.4343

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#3779500 kVIN SERVICE53.2 mi
#57800500 kVIN SERVICE30.2 mi
#47447230 kV0.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WOODLEAF SWITCHING STATION, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WOODLEAF SWITCHING STATION substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WOODLEAF SWITCHING STATIONSubstation-AdjacentNCRowan County500 kV1,000 MW4.3 yrs73.5
UNKNOWN114573Substation-AdjacentNCCabarrus County230 kV300 MW4.3 yrs72.6
UNKNOWN114253Substation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs70.6
HARRISBURGSubstation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs69.7
Greenfield (WOODLEAF SWITCHING STATION - M)GreenfieldNCRowan County500 kV1,000 MW4.3 yrs69.6
Greenfield (PLEASANT GARDEN - WOODLEAF SWI)GreenfieldNCRowan County500 kV1,000 MW4.3 yrs68.1
Greenfield (WOODLEAF SWITCHING STATION - M)GreenfieldNCRowan County500 kV1,000 MW4.3 yrs67.2
UNKNOWN114916Substation-AdjacentNCForsyth County230 kV300 MW4.3 yrs66.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WOODLEAF SWITCHING STATION substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.