WOODLAWN

Substation

North Carolina · DUKE ENERGY CAROLINAS, LLC

Max voltage
230
kV

WOODLAWN is an electric transmission substation in North Carolina, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as high-voltage (230 kv) and connects 14 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage100 kV
Voltage classHigh-voltage (230 kV)
Connected lines14

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Coordinates35.1727, -80.9065

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#40661230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE8.5 mi
#1704230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE8.5 mi
#4142100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE3.8 mi
#18047100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE2.9 mi
#23721100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE3.9 mi
#30143100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE3.9 mi
#32528100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE2.3 mi
#39794100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE3.1 mi
#43409100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE2.3 mi
#44054100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE2.9 mi
#48311100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE3.0 mi
#50149100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE3.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WOODLAWN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WOODLAWN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MCGUIRESubstation-AdjacentNCMecklenburg County500 kV1,000 MW3.7 yrs81.1
Greenfield (UNKNOWN111199 - MCGUIRE)GreenfieldNCGaston County500 kV1,000 MW3.7 yrs73.0
UNKNOWN114573Substation-AdjacentNCCabarrus County230 kV300 MW4.3 yrs72.6
UNKNOWN114646Substation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs72.4
WOODLAWNSubstation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs72.3
TAP169820Substation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs71.4
UNKNOWN114635Substation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs71.3
CATAWBA 230KV SWITCHING STATIONSubstation-AdjacentSCYork County230 kV300 MW4.3 yrs71.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WOODLAWN substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.