WINNESBORO

Substation

North Carolina · DUKE ENERGY CAROLINAS, LLC

Max voltage
230
kV

WINNESBORO is an electric transmission substation in North Carolina, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Coordinates34.5097, -81.0599

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#34493230 kVIN SERVICE13.5 mi
#51367230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE26.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WINNESBORO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WINNESBORO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP142264Substation-AdjacentSCRichland County230 kV300 MW4.3 yrs71.2
UNKNOWN117539Substation-AdjacentSCRichland County230 kV300 MW4.3 yrs70.8
DEADEND167376Substation-AdjacentSCFairfield County230 kV300 MW4.3 yrs69.9
Rocky CreekBrownfieldSCLancaster28 MW68.7
TAP152618Substation-AdjacentSCNewberry County230 kV300 MW4.3 yrs68.2
TAP152558Substation-AdjacentSCFairfield County115 kV100 MW4.3 yrs67.1
TAP152562Substation-AdjacentSCNewberry County230 kV300 MW4.3 yrs67.0
UNKNOWN120939Substation-AdjacentSCKershaw County230 kV300 MW4.3 yrs66.9

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen