WHITEVILLE

Substation

North Carolina · PROGRESS ENERGY CAROLINAS INC

Max voltage
230
kV

WHITEVILLE is an electric transmission substation in North Carolina, operated by PROGRESS ENERGY CAROLINAS INC. It is classified as high-voltage (230 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines5

Ownership & operation

OperatorPROGRESS ENERGY CAROLINAS INC
Coordinates34.3061, -78.6504

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#4918230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE29.5 mi
#8981230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE16.0 mi
#32321230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE7.0 mi
#52213115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE0.4 mi
#52219115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE1.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WHITEVILLE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WHITEVILLE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN146834Substation-AdjacentSCHorry County230 kV300 MW4.3 yrs68.8
UNKNOWN114004Substation-AdjacentNCRobeson County230 kV300 MW4.3 yrs66.4
UNKNOWN121598Substation-AdjacentSCHorry County115 kV100 MW4.3 yrs65.0
TAP147236Substation-AdjacentNCColumbus County230 kV300 MW4.3 yrs64.7
UNKNOWN157236Substation-AdjacentNCBladen County230 kV300 MW4.3 yrs64.6
TAP158331Substation-AdjacentNCBladen County230 kV300 MW4.3 yrs64.5
UNKNOWN112294Substation-AdjacentNCColumbus County230 kV300 MW4.3 yrs64.5
UNKNOWN123038Substation-AdjacentSCHorry County115 kV100 MW4.3 yrs63.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for WHITEVILLE substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.