WALLACE

Substation

North Carolina · PROGRESS ENERGY CAROLINAS INC

Max voltage
230
kV

WALLACE is an electric transmission substation in North Carolina, operated by PROGRESS ENERGY CAROLINAS INC. It is classified as high-voltage (230 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage115 kV
Voltage classHigh-voltage (230 kV)
Connected lines5

Ownership & operation

OperatorPROGRESS ENERGY CAROLINAS INC
Coordinates34.7763, -77.9323

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#7881230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE54.9 mi
#38235230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE19.7 mi
#41578230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE28.2 mi
#38720115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE6.6 mi
#57238115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE16.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WALLACE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WALLACE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN157236Substation-AdjacentNCBladen County230 kV300 MW4.3 yrs64.6
UNKNOWN112758Substation-AdjacentNCSampson County115 kV100 MW4.3 yrs63.3
CLINTONSubstation-AdjacentNCSampson County230 kV300 MW4.3 yrs63.1
TAP148433Substation-AdjacentNCOnslow County230 kV300 MW4.3 yrs61.7
UNKNOWN162474Substation-AdjacentNCSampson County115 kV100 MW4.3 yrs60.8
WALLACESubstation-AdjacentNCDuplin County230 kV300 MW4.3 yrs60.6
UNKNOWN112227Substation-AdjacentNCOnslow County230 kV300 MW4.3 yrs60.6
TAP158332Substation-AdjacentNCBladen County230 kV300 MW4.3 yrs60.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.