TUGALO
SubstationNorth Carolina · GEORGIA POWER CO
TUGALO is an electric transmission substation in North Carolina, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #27003 | 115 kV | GEORGIA POWER CO | IN SERVICE | 2.9 mi |
| #36420 | 115 kV | GEORGIA POWER CO | — | 0.0 mi |
| #38369 | 115 kV | GEORGIA POWER CO | IN SERVICE | 2.9 mi |
| #40777 | 115 kV | GEORGIA POWER CO | IN SERVICE | 1.4 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TUGALO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| Greenfield (BAD CREEK - JOCASSEE TIE) | Greenfield | SC | Oconee County | 500 kV | 1,000 MW | 3.7 yrs | 66.7 |
| UNKNOWN111238 | Substation-Adjacent | GA | Banks County | 230 kV | 300 MW | 4.3 yrs | 63.3 |
| Greenfield (UNKNOWN110410 - SOUTH HALL) | Greenfield | SC | Oconee County | 500 kV | 1,000 MW | 4.3 yrs | 62.7 |
| UNKNOWN111248 | Substation-Adjacent | GA | Hart County | 115 kV | 100 MW | 4.3 yrs | 62.5 |
| UNKNOWN111239 | Substation-Adjacent | GA | Banks County | 230 kV | 300 MW | 4.3 yrs | 62.1 |
| Greenfield (UNKNOWN110410 - SOUTH HALL) | Greenfield | GA | Banks County | 500 kV | 1,000 MW | 4.3 yrs | 62.1 |
| UNKNOWN111242 | Substation-Adjacent | GA | Franklin County | 115 kV | 100 MW | 4.3 yrs | 61.6 |
| TAP173818 | Substation-Adjacent | GA | Franklin County | 115 kV | 100 MW | 4.3 yrs | 61.5 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TUGALO substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.