TIGER TIE

Substation

North Carolina · DUKE ENERGY CAROLINAS, LLC

Max voltage
230
kV

TIGER TIE is an electric transmission substation in North Carolina, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as high-voltage (230 kv) and connects 14 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage100 kV
Voltage classHigh-voltage (230 kV)
Connected lines14

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Coordinates34.9444, -82.2008

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#37597230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE18.4 mi
#26303230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE28.0 mi
#27782230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE18.4 mi
#23835230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE28.0 mi
#21550100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE2.3 mi
#21893100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE4.5 mi
#35632100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE4.8 mi
#39500100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE4.8 mi
#48911100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE5.2 mi
#1559100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE2.7 mi
#58346100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE7.9 mi
#2654100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE5.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TIGER TIE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TIGER TIE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TIGER TIESubstation-AdjacentSCSpartanburg County230 kV300 MW3.7 yrs75.4
NORTH GREENVILLE TIESubstation-AdjacentSCGreenville County230 kV300 MW3.7 yrs72.3
Greenfield (UNKNOWN111199 - JOCASSEE TIE)GreenfieldNCPolk County500 kV1,000 MW3.7 yrs71.1
Greenfield (TIGER TIE - PEACH VALLEY TIE)GreenfieldSCSpartanburg County230 kV300 MW3.7 yrs71.0
UNKNOWN110875Substation-AdjacentNCRutherford County115 kV100 MW3.7 yrs70.3
UNKNOWN110591Substation-AdjacentNCHenderson County115 kV100 MW3.7 yrs70.2
Greenfield (UNKNOWN111199 - JOCASSEE TIE)GreenfieldSCGreenville County500 kV1,000 MW3.7 yrs69.8
EAST SPARTANBURGSubstation-AdjacentSCSpartanburg County100 kV50 MW3.7 yrs69.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.