TAP170265
SubstationNorth Carolina
TAP170265 is an electric transmission substation in North Carolina. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #58462 | 115 kV | — | IN SERVICE | 14.1 mi |
| #58464 | 115 kV | — | IN SERVICE | 2.6 mi |
| #58465 | 115 kV | — | IN SERVICE | 0.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP170265, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| PACOLET TIE | Substation-Adjacent | SC | Cherokee County | 230 kV | 300 MW | 3.7 yrs | 74.7 |
| Sediver | Brownfield | SC | York County | — | 520 MW | 3.7 yrs | 70.8 |
| DEADEND167376 | Substation-Adjacent | SC | Fairfield County | 230 kV | 300 MW | 4.3 yrs | 69.9 |
| EAST SPARTANBURG | Substation-Adjacent | SC | Spartanburg County | 100 kV | 50 MW | 3.7 yrs | 69.7 |
| Greenfield (UNKNOWN110410 - NEWPORT TIE) | Greenfield | SC | York County | 500 kV | 1,000 MW | 4.3 yrs | 69.5 |
| Greenfield (UNKNOWN110410 - NEWPORT TIE) | Greenfield | SC | York County | 500 kV | 1,000 MW | 4.3 yrs | 67.1 |
| TAP152558 | Substation-Adjacent | SC | Fairfield County | 115 kV | 100 MW | 4.3 yrs | 67.1 |
| TAP152562 | Substation-Adjacent | SC | Newberry County | 230 kV | 300 MW | 4.3 yrs | 67.0 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for TAP170265 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.