TAP170257

Substation

North Carolina · DUKE ENERGY PROGRESS - (NC)

Max voltage
230
kV

TAP170257 is an electric transmission substation in North Carolina, operated by DUKE ENERGY PROGRESS - (NC). It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY PROGRESS - (NC)
Co-ownerPROGRESS ENERGY CAROLINAS INC
Coordinates33.9578, -80.3403

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#56681230 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE0.8 mi
#56682230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE0.4 mi
#58217230 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE4.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP170257, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP170257 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP142264Substation-AdjacentSCCalhoun County230 kV300 MW3.7 yrs73.7
WATEREE STATIONSubstation-AdjacentSCCalhoun County230 kV300 MW3.7 yrs71.4
UNKNOWN120919Substation-AdjacentSCClarendon County230 kV300 MW3.7 yrs70.7
CAMDENSubstation-AdjacentSCKershaw County230 kV300 MW4.3 yrs69.0
Greenfield (WATEREE STATION - UNKNOWN17011)GreenfieldSCCalhoun County230 kV300 MW3.7 yrs68.1
Greenfield (UNKNOWN120831 - WATEREE STATIO)GreenfieldSCCalhoun County230 kV300 MW3.7 yrs67.5
TAP170187Substation-AdjacentSCLee County230 kV300 MW4.3 yrs67.3
UNKNOWN170256Substation-AdjacentSCSumter County230 kV300 MW4.3 yrs67.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.