TAP167440

Substation

North Carolina · DUKE ENERGY PROGRESS - (NC)

Max voltage
115
kV

TAP167440 is an electric transmission substation in North Carolina, operated by DUKE ENERGY PROGRESS - (NC). It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY PROGRESS - (NC)
Co-ownerPROGRESS ENERGY CAROLINAS INC
Coordinates34.1923, -79.4525

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#50760115 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE3.6 mi
#51691115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE5.6 mi
#51693115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE2.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP167440, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP167440 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN121331Substation-AdjacentSCMarion County230 kV300 MW4.3 yrs68.0
SOCIETY HILLSubstation-AdjacentSCMarlboro County230 kV300 MW4.3 yrs67.9
UNKNOWN121599Substation-AdjacentSCHorry County115 kV100 MW4.3 yrs67.6
TAP146637Substation-AdjacentSCDillon County230 kV300 MW4.3 yrs65.2
UNKNOWN122764Substation-AdjacentSCHorry County115 kV100 MW3.7 yrs65.0
TAP146838Substation-AdjacentSCHorry County115 kV100 MW3.7 yrs64.4
UNKNOWN120928Substation-AdjacentSCDillon County230 kV300 MW4.3 yrs64.1
UNKNOWN113104Substation-AdjacentNCRobeson County230 kV300 MW4.3 yrs63.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP167440 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.