TAP167362

Substation

North Carolina · DUKE ENERGY CAROLINAS, LLC

Max voltage
115
kV

TAP167362 is an electric transmission substation in North Carolina, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Coordinates34.2569, -81.5625

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#51612115 kVIN SERVICE8.7 mi
#51615115 kVIN SERVICE0.0 mi
#51616115 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE2.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP167362, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP167362 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DEADEND167376Substation-AdjacentSCFairfield County230 kV300 MW4.3 yrs69.9
UNKNOWN117831Substation-AdjacentSCLexington County230 kV300 MW4.3 yrs69.3
UNKNOWN160652Substation-AdjacentSCLexington County115 kV100 MW4.3 yrs68.4
TAP152618Substation-AdjacentSCNewberry County230 kV300 MW4.3 yrs68.2
UNKNOWN160722Substation-AdjacentSCLexington County115 kV100 MW4.3 yrs67.8
SALUDA LEXINGTONSubstation-AdjacentSCLexington County115 kV100 MW4.3 yrs67.3
TAP152558Substation-AdjacentSCFairfield County115 kV100 MW4.3 yrs67.1
Buzzard RoostBrownfieldSCGreenwood15 MW67.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP167362 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.