TAP162761

Substation

North Carolina · DUKE ENERGY PROGRESS - (NC)

Max voltage
115
kV

TAP162761 is an electric transmission substation in North Carolina, operated by DUKE ENERGY PROGRESS - (NC). It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY PROGRESS - (NC)
Co-ownerPROGRESS ENERGY CAROLINAS INC
Coordinates36.0802, -78.3306

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#13425115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE0.1 mi
#17551115 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE0.9 mi
#57282115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE5.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP162761, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP162761 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WAKESubstation-AdjacentNCWake County500 kV1,000 MW3.1 yrs76.2
TAP147409Substation-AdjacentNCWake County230 kV300 MW4.3 yrs73.1
TAP147178Substation-AdjacentNCWake County230 kV300 MW4.3 yrs72.3
TAP147417Substation-AdjacentNCWake County230 kV300 MW4.3 yrs72.3
TAP169945Substation-AdjacentNCWake County230 kV300 MW4.3 yrs71.6
UNKNOWN147187Substation-AdjacentNCWake County230 kV300 MW4.3 yrs71.4
UNKNOWN115161Substation-AdjacentNCWake County230 kV300 MW4.3 yrs71.2
UNKNOWN115448Substation-AdjacentNCWake County230 kV300 MW4.3 yrs71.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP162761 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.