TAP162467

Substation

North Carolina · DUKE ENERGY PROGRESS - (NC)

Max voltage
115
kV

TAP162467 is an electric transmission substation in North Carolina, operated by DUKE ENERGY PROGRESS - (NC). It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY PROGRESS - (NC)
Coordinates35.4026, -79.6064

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#10787115 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE29.9 mi
#17244115 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE0.2 mi
#50068115 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE15.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP162467, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP162467 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN114159Substation-AdjacentNCMoore County230 kV300 MW4.3 yrs66.7
UNKNOWN114156Substation-AdjacentNCMoore County230 kV300 MW4.3 yrs65.8
EDEN SOLAR LLCSubstation-AdjacentNCRichmond County230 kV300 MW4.3 yrs64.3
UNKNOWN114155Substation-AdjacentNCLee County230 kV300 MW4.3 yrs64.2
TAP146710Substation-AdjacentNCLee County230 kV300 MW4.3 yrs64.1
TAP147642Substation-AdjacentNCMoore County230 kV300 MW4.3 yrs64.1
BEAR CREEK SOLARSubstation-AdjacentNCChatham County115 kV100 MW4.3 yrs63.1
COUGAR SOLAR, LLCSubstation-AdjacentNCLee County230 kV300 MW4.3 yrs63.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP162467 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.