TAP162092

Substation

North Carolina · DUKE ENERGY CAROLINAS, LLC

Max voltage
100
kV

TAP162092 is an electric transmission substation in North Carolina, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as distribution (69–115 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage100 kV
Min voltage100 kV
Voltage classDistribution (69–115 kV)
Connected lines5

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Coordinates34.7343, -82.3705

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16274100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE1.0 mi
#41280100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE0.6 mi
#41305100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE0.3 mi
#41306100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE1.0 mi
#41313100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE0.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP162092, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP162092 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TIGER TIESubstation-AdjacentSCSpartanburg County230 kV300 MW3.7 yrs75.4
NORTH GREENVILLE TIESubstation-AdjacentSCGreenville County230 kV300 MW3.7 yrs72.3
Greenfield (TIGER TIE - PEACH VALLEY TIE)GreenfieldSCSpartanburg County230 kV300 MW3.7 yrs71.0
Greenfield (UNKNOWN111199 - JOCASSEE TIE)GreenfieldSCGreenville County500 kV1,000 MW3.7 yrs69.8
Greenfield (UNKNOWN111199 - JOCASSEE TIE)GreenfieldNCPolk County500 kV1,000 MW3.7 yrs69.1
SHILOH SWITCHING STATIONSubstation-AdjacentSCPickens County230 kV300 MW3.7 yrs69.0
UNKNOWN170138Substation-AdjacentSCGreenville County100 kV50 MW3.7 yrs68.6
SHADY GROVESubstation-AdjacentSCGreenville County230 kV300 MW4.3 yrs68.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP162092 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.