TAP156318

Substation

North Carolina · DUKE ENERGY PROGRESS - (NC)

Max voltage
115
kV

TAP156318 is an electric transmission substation in North Carolina, operated by DUKE ENERGY PROGRESS - (NC). It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorDUKE ENERGY PROGRESS - (NC)
Co-ownerPROGRESS ENERGY CAROLINAS INC
Coordinates35.0053, -78.1075

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#9211115 kVDUKE ENERGY PROGRESS - (NC)IN SERVICE0.1 mi
#52379115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE1.5 mi
#52380115 kVPROGRESS ENERGY CAROLINAS INCIN SERVICE1.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP156318, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP156318 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP147987Substation-AdjacentNCJohnston County230 kV300 MW4.3 yrs65.2
UNKNOWN112699Substation-AdjacentNCWayne County230 kV300 MW4.3 yrs64.4
UNKNOWN112765Substation-AdjacentNCSampson County230 kV300 MW4.3 yrs63.6
UNKNOWN112758Substation-AdjacentNCSampson County115 kV100 MW4.3 yrs63.3
CLINTONSubstation-AdjacentNCSampson County230 kV300 MW4.3 yrs63.1
UNKNOWN148081Substation-AdjacentNCWayne County230 kV300 MW4.3 yrs62.8
UNKNOWN169951Substation-AdjacentNCWayne County115 kV100 MW4.3 yrs62.4
SEYMOUR JOHNSONSubstation-AdjacentNCWayne County115 kV100 MW4.3 yrs62.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP156318 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.