TAP154624

Substation

North Carolina · GEORGIA POWER CO

Max voltage
115
kV

TAP154624 is an electric transmission substation in North Carolina, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
Coordinates34.7099, -83.2798

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#1681115 kVIN SERVICE17.3 mi
#20827115 kVGEORGIA POWER CO0.1 mi
#35500115 kVGEORGIA POWER COIN SERVICE0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP154624, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP154624 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
JOCASSEE TIESubstation-AdjacentSCPickens County500 kV1,000 MW3.7 yrs70.0
UNKNOWN110410Substation-AdjacentSCOconee County500 kV1,000 MW4.3 yrs69.6
Greenfield (BAD CREEK - JOCASSEE TIE)GreenfieldSCOconee County500 kV1,000 MW3.7 yrs66.7
EC Near John S RaineyGreenfieldSCAnderson3.7 yrs63.3
UNKNOWN111238Substation-AdjacentGABanks County230 kV300 MW4.3 yrs63.3
JOCASSEE SWITCHING STATIONSubstation-AdjacentSCPickens County230 kV300 MW4.3 yrs63.2
Greenfield (UNKNOWN110410 - SOUTH HALL)GreenfieldSCOconee County500 kV1,000 MW4.3 yrs62.7
UNKNOWN111248Substation-AdjacentGAHart County115 kV100 MW4.3 yrs62.5

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP154624 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.