TAP154607

Substation

North Carolina · GEORGIA POWER CO

Max voltage
115
kV

TAP154607 is an electric transmission substation in North Carolina, operated by GEORGIA POWER CO. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

OperatorGEORGIA POWER CO
Coordinates33.8372, -83.2175

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#19472115 kVGEORGIA POWER COIN SERVICE28.4 mi
#37602115 kVGEORGIA POWER COIN SERVICE0.0 mi
#50059115 kVGEORGIA POWER COIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP154607, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP154607 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN112382Substation-AdjacentGATaliaferro County230 kV300 MW3.7 yrs68.5
EAST SOCIAL CIRCLESubstation-AdjacentGAOconee County230 kV300 MW4.3 yrs68.3
UNKNOWN112368Substation-AdjacentGAMorgan County115 kV100 MW5.8 yrs68.1
UNKNOWN112369Substation-AdjacentGAMorgan County115 kV100 MW5.8 yrs67.9
TAP142193Substation-AdjacentGAMorgan County115 kV100 MW5.8 yrs67.4
UNKNOWN112367Substation-AdjacentGAMorgan County115 kV100 MW5.8 yrs67.2
UNKNOWN112379Substation-AdjacentGAGreene County230 kV300 MW3.7 yrs67.0
UNKNOWN111491Substation-AdjacentGAMadison County230 kV300 MW4.3 yrs66.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP154607 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.