TAP154440

Substation

North Carolina · DUKE ENERGY CAROLINAS, LLC

Max voltage
100
kV

TAP154440 is an electric transmission substation in North Carolina, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as distribution (69–115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage100 kV
Min voltage100 kV
Voltage classDistribution (69–115 kV)
Connected lines4

Ownership & operation

OperatorDUKE ENERGY CAROLINAS, LLC
Coordinates34.4437, -82.3948

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16284100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE16.6 mi
#23869100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE16.6 mi
#44129100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE4.0 mi
#44168100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE4.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP154440, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP154440 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SHADY GROVESubstation-AdjacentSCGreenville County230 kV300 MW4.3 yrs68.2
TAP150466Substation-AdjacentSCAnderson County100 kV50 MW4.3 yrs67.5
Greenfield (UNKNOWN110410 - NEWPORT TIE)GreenfieldSCGreenville County500 kV1,000 MW4.3 yrs66.8
OZ GreenvilleGreenfieldSCGreenville3.7 yrs66.6
UNKNOWN113391Substation-AdjacentSCAbbeville County230 kV300 MW4.3 yrs66.2
Greenfield (UNKNOWN110410 - NEWPORT TIE)GreenfieldSCLaurens County500 kV1,000 MW4.3 yrs66.2
CENTRAL TIESubstation-AdjacentSCPickens County230 kV300 MW4.3 yrs66.2
EC Near Enoree Phase II Landfill Gas RecoveryGreenfieldSCGreenville3.7 yrs66.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP154440 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.