TAP154206

Substation

North Carolina

Max voltage
100
kV

TAP154206 is an electric transmission substation in North Carolina. It is classified as distribution (69–115 kv) and connects 7 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage100 kV
Min voltage100 kV
Voltage classDistribution (69–115 kV)
Connected lines7

Ownership & operation

Operator not catalogued for this substation.

Coordinates35.8005, -80.8425

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#1303100 kVIN SERVICE16.9 mi
#21941100 kVIN SERVICE2.3 mi
#22101100 kVIN SERVICE0.1 mi
#22200100 kVIN SERVICE10.0 mi
#23385100 kVIN SERVICE2.3 mi
#32038100 kVIN SERVICE10.0 mi
#49745100 kVIN SERVICE14.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP154206, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP154206 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MCGUIRESubstation-AdjacentNCMecklenburg County500 kV1,000 MW3.7 yrs81.1
UNKNOWN114573Substation-AdjacentNCCabarrus County230 kV300 MW4.3 yrs72.6
ANTIOCHSubstation-AdjacentNCWilkes County500 kV1,000 MW3.1 yrs72.0
UNKNOWN110993Substation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs70.1
Greenfield (WOODLEAF SWITCHING STATION - M)GreenfieldNCRowan County500 kV1,000 MW4.3 yrs69.6
MARSHALL STEAM STATIONSubstation-AdjacentNCCatawba County230 kV300 MW4.3 yrs68.3
Greenfield (PLEASANT GARDEN - WOODLEAF SWI)GreenfieldNCRowan County500 kV1,000 MW4.3 yrs68.1
Greenfield (WOODLEAF SWITCHING STATION - M)GreenfieldNCRowan County500 kV1,000 MW4.3 yrs67.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP154206 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.