TAP154205

Substation

North Carolina

Max voltage
100
kV

TAP154205 is an electric transmission substation in North Carolina. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage100 kV
Min voltage100 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates35.4113, -80.8594

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#13645100 kVIN SERVICE3.3 mi
#26086100 kVIN SERVICE1.5 mi
#40676100 kVIN SERVICE0.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP154205, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP154205 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MCGUIRESubstation-AdjacentNCMecklenburg County500 kV1,000 MW3.7 yrs81.1
Greenfield (UNKNOWN111199 - MCGUIRE)GreenfieldNCGaston County500 kV1,000 MW3.7 yrs73.0
UNKNOWN114573Substation-AdjacentNCCabarrus County230 kV300 MW4.3 yrs72.6
UNKNOWN114646Substation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs72.4
WOODLAWNSubstation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs72.3
TAP169820Substation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs71.4
UNKNOWN114635Substation-AdjacentNCMecklenburg County230 kV300 MW4.3 yrs71.3
CATAWBA 230KV SWITCHING STATIONSubstation-AdjacentSCYork County230 kV300 MW4.3 yrs71.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP154205 substation, North Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.